Content on this page requires a newer version of Adobe Flash Player.

Get Adobe Flash player

 
   
 

The foundation stone of this factory, the first of the TN&Platex group, was laid
in November 1979. From its origin to 2010, the initial production volume has
multiplied by fourteen times.

Characteristics of the plant

Location of the plant: Armenia 501 (3220), Monte Caseros
Meters built: 32,000 m2 on 70 hectares
Plant staff: 300 people
Equipped with machinery: Rieter
Production capacity: 1,900 tones per month

TE: +54 (03775) 423768
Fax: +54 (03775) 422794

Email: corrientes@tnplatex.com

You should visit:

Headquarters